| Abstract: | The European Space Agency (ESA), within its FutureNAV programme, is developing Celeste, a Low Earth Orbit Positioning, Navigation and Timing (LEO-PNT) system conceived to complement Galileo through a multilayer PNT architecture. Within this programme, GMV acts as one of the two System Prime contractors for the Celeste In-Orbit Demonstration (IOD), being responsible for the end-to-end design, integration, launch, and in-orbit validation of its demonstration system. The first demonstration satellite, IOD1, was successfully launched on 28 March 2026 into a 510 km near-polar Sun-synchronous orbit. The mission represents the first in-orbit implementation of the Celeste system and the first transmission of Celeste LEO-PNT signals, constituting a major milestone towards the validation of a European multilayer PNT architecture. The GMV Celeste demonstration system comprises the IOD1 satellite, a Ground Segment as a Service (GSaaS), a dedicated Test User Segment equipped with Celeste Test User Receiver (TUR) units, and an Experimentation Segment supporting end-to-end system validation. The payload autonomously performs onboard Orbit Determination and Time Synchronisation (ODTS), navigation message generation, and multi-band LEO-PNT signal transmission, enabling the complete validation chain from onboard signal generation to user-level reception. This paper presents the first end-to-end in-orbit validation of the GMV Celeste demonstration system, including onboard navigation message generation, LEO-PNT signal transmission, user-level reception, observable production, navigation message decoding, and end-to-end system validation. The reported results include the first characterization of the transmitted E5- and SR-band signals, verification of the onboard navigation message generation process, and end-to-end reception using dedicated Test User Receiver units. The reported results demonstrate the successful operation of the payload in orbit and show good agreement between the measured signal characteristics and the corresponding ground qualification results. Together, these results provide the first experimental validation of the Celeste system architecture and establish the foundation for the subsequent demonstration satellites and future in-orbit performance assessment. |
| Published in: |
Proceedings of the 39th International Technical Meeting of the Satellite Division of the Institute of Navigation (ION GNSS+ 2026) September 14 - 18, 2026 Hyatt Regency Grand Cypress Orlando, Florida |
| Pages: | 3469 - 3478 |
| Cite this article: | Catalán, Carlos, Pisonero, César, Fernández, Eduardo, Juez, Andrés, Breeuwer, Edward, Cordero, Miguel, Giordano, Pietro, "Celeste: First In Orbit LEO-PNT Demonstration," Proceedings of the 39th International Technical Meeting of the Satellite Division of the Institute of Navigation (ION GNSS+ 2026), Orlando, Florida, September 2026, pp. 3469-3478. https://doi.org/10.33012/2026.20813 |
| Full Paper: |
Sign in to download with your ION membership, download credits or subscription, or buy this article. Sign In Buy this article: $12 for ION members, $35 for non-members |
| References: |
Show 5 references
|