Onboard Navigation System Design for Altus-1 and Strategies for LCRNS SISE Compliance

Tara Mina, Jason Leonard, David Gaylor, Shaun Stewart, and John Christian

Peer Reviewed

Abstract: The Artemis campaign and broader international efforts toward sustained lunar exploration are increasing demand for reliable navigation and timing services in cislunar space, particularly near the lunar south pole. This work focuses on Altus-1, the first spacecraft in Intuitive Machines' Lunar Data Network (LDN), scheduled for launch in the first quarter of 2027 as part of the IM-3 rideshare. LDN is designed to support IOC-C services for navigation and communications over the lunar South pole region. For precise orbit determination, Altus-1 employs an onboard delayed-state extended Kalman filter using weak-signal GNSS measurements. This work presents an updated analysis of Altus-1 navigation performance together with a system-level analysis of several factors contributing to signal-in-space error (SISE), under realistic lunar dynamics and operating conditions. In particular, we quantify SISE contributions from both real-time state estimation and forward state prediction over multiple broadcast ephemeris and clock parameter validity periods. Results further examine the role of various ground-based support strategies on limiting error growth during periods of reduced observability. A radial–along-track–cross-track (RAC) dilution of precision (DOP) formulation is also introduced to characterize time-varying Earth-line-of-sight geometry. These investigations demonstrate that IOC-C performance can be sustained through appropriate navigation update intervals and targeted ground support strategies.
Published in: Proceedings of the 39th International Technical Meeting of the Satellite Division of the Institute of Navigation (ION GNSS+ 2026)
September 14 - 18, 2026
Hyatt Regency Grand Cypress
Orlando, Florida
Pages: 1733 - 1749
Cite this article: Mina, Tara, Leonard, Jason, Gaylor, David, Stewart, Shaun, Christian, John, "Onboard Navigation System Design for Altus-1 and Strategies for LCRNS SISE Compliance," Proceedings of the 39th International Technical Meeting of the Satellite Division of the Institute of Navigation (ION GNSS+ 2026), Orlando, Florida, September 2026, pp. 1733-1749. https://doi.org/10.33012/2026.20677
Full Paper:

Sign in to download with your ION membership, download credits or subscription, or buy this article.

Sign In Buy this article: $12 for ION members, $35 for non-members
References:
Show 20 references
  1. Brack, D., Roorda, T., Mathur, R., Gaylor, D., Hartigan, M., Ryden, G., Crenshaw, J., Volle, M., and Stewart, S. (2025). Preliminary design of the lunar data network constellation under operational considerations. In Proceedings of the AAS/AIAA Astrodynamics Specialist Conference, Boston, MA, USA.
  2. Goossens, S., Sabaka, T. J., Wieczorek, M. A., Neumann, G. A., Mazarico, E., Lemoine, F. G., Nicholas, J. B., Smith, D. E., and Zuber, M. T. (2020). High-resolution gravity field models from grail data and implications for models of the density structure of the moon's crust. Journal of Geophysical Research: Planets, 125(2):e2019JE006086.
  3. Iiyama, K., Bhamidipati, S., and Gao, G. (2024). Precise positioning and timekeeping in a lunar orbit via terrestrial gps time-differenced carrier-phase measurements. NAVIGATION: Journal of the Institute of Navigation, 71(1).
  4. Iiyama, K. and Gao, G. (2025). Ionospheric and plasmaspheric delay characterization and mitigation methodologies for lunar terrestrial gnss receivers. In Proceedings of the 38th International Technical Meeting of the Satellite Division of The Institute of Navigation (ION GNSS+ 2025), pages 3193-3210.
  5. Iiyama, K., Kawabata, Y., and Funase, R. (2021). Autonomous and decentralized orbit determination and clock offset estimation of lunar navigation satellites using GPS signals and inter-satellite ranging. In Proceedings of the 34th International Technical Meeting of the Satellite Division of The Institute of Navigation (ION GNSS+ 2021), pages 936-949.
  6. Israel, D. J., Mauldin, K. D., Roberts, C. J., Mitchell, J. W., Pulkkinen, A. A., La Vida, D. C., Johnson, M. A., Christe, S. D., and Gramling, C. J. (2020). LunaNet: a flexible and extensible lunar exploration communications and navigation infrastructure. In 2020 IEEE Aerospace Conference, pages 1-14. IEEE.
  7. Leonard, J. M., Stewart, S. M., and Gaylor, D. E. (2026). Relativistic framework for disseminating lunar time for the Intuitive Machines LCRNS PNT constellation. In Proceedings of the ION PTTI 2026 Meeting, Anaheim, CA. Institute of Navigation.
  8. Mina, T., Marinello, L., and Christian, J. (2025a). Remarks on stochastic cloning and delayed-state filtering. arXiv preprint arXiv:2508.21260.
  9. Mina, T., Thrasher, A., Hartigan, M., Leonard, J., Stewart, S., Antreasian, P., Pipich, K., Brack, D., Gaylor, D., Bedford-Dillow, B., et al. (2025b). Preliminary navigation system design for the first lcrns satellite providing lunar pnt services. In Proceedings of the 38th International Technical Meeting of the Satellite Division of The Institute of Navigation (ION GNSS+ 2025), pages 2909-2946.
  10. Murata, M., Kawano, I., and Kogure, S. (2022). Lunar navigation satellite system and positioning accuracy evaluation. In Proceedings of the 2022 International Technical Meeting of The Institute of Navigation, pages 582-586.
  11. NASA (2022). Lunar relay services requirements document (SRD). Technical Report ESC-LCRNS-REQ-0090, NASA. Revision B, Available: https://www.nasa.gov/wp-content/uploads/2025/08/ lunar-relay-services-requirements-document-srd.pdf.
  12. NASA (2023). Why Artemis Will Focus on the Lunar South Polar Region. Architecture concept review 2022 white paper, National Aeronautics and Space Administration. Accessed Feb 25, 2026.
  13. NASA (2024). NASA selects lunar relay contractor for near space network services. https://www.nasa.gov/news-release/ nasa-selects-lunar-relay-contractor-for-near-space-network-services/. Accessed Feb 25, 2026.
  14. NASA (2025a). LunaNet interoperability specification document version 5. Technical report, National Aeronautics and Space Administration.
  15. NASA (2025b). Lunar communications relay and navigation systems (LCRNS). https://www.nasa.gov/goddard/esc/ lcrns/. Accessed Feb 25, 2026.
  16. NASA (2026a). Artemis: Humans in space -NASA's Moon-to-Mars exploration campaign. https://www.nasa.gov/ humans-in-space/artemis/. Accessed Feb 25, 2026.
  17. NASA (2026b). Artemis II: NASA's first crewed lunar flyby in 50 years. https://www.nasa.gov/mission/artemis-ii/. Accessed Feb 25, 2026.
  18. Parker, J. J., Dovis, F., Konitzer, L., Esantsi, N., Ashman, B., Minetto, A., Nardin, A., Vouch, O., Zocca, S., Bernardi, F., et al. (2026). Gnss reception at the moon: First results of the lunar gnss receiver experiment (lugre). Navigation, 73(1):756.
  19. Small, J. L., Mann, L. M., Crenshaw, J. M., Gramling, C. J., Rosales, J. J., Winternitz, L. B., Hassouneh, M. A., Baker, D. A., Hur-Diaz, S., and Liounis, A. J. (2022). Lunar relay onboard navigation performance and effects on lander descent to surface. In Proceedings of the 2022 International Technical Meeting of The Institute of Navigation, pages 587-601.
  20. SpaceNews (2026). Intuitive Machines wins contract for three GEO satellites. https://spacenews.com/ intuitive-machines-wins-contract-for-three-geo-satellites/.