Abstract: | Since August of 1954 the Range Contractor, Pan Am World Services, together with its subcontractor, RCA Service Company, has operated and maintained all equipment and systems at the Eastern Test Range (ETR) for the Air Force and has performed Data Reduction and Engineering Development services. During this period missile development has been phenomenal, from the relatively simple Matador missiles to the very complex Atlas, Titan, Delta, and Trident vehicles. The development of accurate PTTI systems has had to keep pace, until today the ETR timing system accuracy requirements are specified in fractions of microseconds. This paper will describe PITI systems at the Eastern Space and Missile Center (ESMC) and what is being done to meet the present and future requirements. |
Published in: |
Proceedings of the 18th Annual Precise Time and Time Interval Systems and Applications Meeting December 2 - 4, 1986 DuPont Plaza Hotel Washington, DC |
Pages: | 529 - 539 |
Cite this article: | Wright, James L., "PTTI SYSTEMS ON THE EASTERN TEST RANGE," Proceedings of the 18th Annual Precise Time and Time Interval Systems and Applications Meeting, Washington, DC, December 1986, pp. 529-539. |
Full Paper: |
ION Members/Non-Members: 1 Download Credit
Sign In |