Navigation Layer Capabilities PLEO Space to Ground Ka-Band Optical TWTT and Ranging
Michael Ammendola, USN; Edward D. Powers, The Aerospace Corporation; Gregory L. Weaver, JHU/APL
Location: Ballroom C
Date/Time: Tuesday, Jun. 2, 8:35 a.m.
The Space Development Agency (SDA) began its launch schedule of the Tranche 1 Transport Layer (T1TL) constellation in AUG 2025, with the expectation of completion by the end of 2026. On-board each of the 126 T1TL space vehicles (SV) is a Ka-band radio which uses the DVB-S2 communications protocol for high-speed space to ground (S2G) telemetry and command operations. Also, on-board each T1TL SV are three to four optical terminals to support both the PWSA space-based optical mesh and S2G optical communications. These optical terminals are interoperable per the SDA optical standard (currently OCT Std. 3.1.0). In both the Ka-band and optical terminals, the respective communications protocols have been modified to support S2G two-way time transfer (TWTT) and ranging.
The incorporation of time transfer and ranging capabilities into the Ka-band and optical links is fundamental to the NAVWAR resilience of the PWSA as the inter-satellite and S2G measurements from all T1 SVs are continuously sent to the navigation fusion application known as Constellation Speed Timing Attitude and Ranging (COSTAR). The operation of COSTAR provides GPS independent orbit determination and SV clock corrections to maintain both SV guidance, navigation and control and form a constellation-wide timescale with performance not to exceed PVT requirements of 10m, 0.03 m/s, 20 ns to UTC(USNO). These PVT requirements are referenced by the locating of the S2G ground entry points (GEPs) to within 10 cm of WGS-84 and timing directly traceable to UTC(USNO). The qualities provided by COSTAR and the global availability of Ka-band and optical S2G links enables the SDA to provide time transfer and ranging to tactical users through S2G ICD compliant equipment.
Our presentation will provide TWTT tactical use case employment details and review the results of optical and Ka-band verification test reports and artifacts from T1. Specific information will be provided discussing terminal interoperability and ground interface requirements. In all the results to be presented, compliance to better than 3 ns relative time transfer will be shown to promote tactical use across Service and CCMD CONOPs for GPS independent UTC(USNO) traceable timing dissemination.